Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Example of a Team Allocation roster set to TARGETED with a work allocation of CYCLICAL. The first Team Member in the roster cycle will be targeted (Edward Johnston). As the target workload is 3 Edward will be allocated issues until he reaches the workload threshold. Once reached the next team members will be allocated issues until Edward drops below 3 then issues will continue to target Edward until he again hits the workload threshold.  After 24 hours (If team shifts are not entered) or on shift completion the Targeted team member will become the next team member in the cycle, in this example it will be Sally Norman.

Widget Connector
width640
urlhttps://www.youtube.com/watch?v=fn1XQ7iM1eY&feature=youtu.be
height360

...